CBS62logoNEW2013_blue_final_header_White wwj950-sm2011b 971-ticket-35smb 35h_CBSSportsRad_Detroit

Clean Green Energy, Chesterfield Twp. Firm Partner For Wind Turbines

View Comments
Clean Green Energy
(credit: istock) Technology Report
Read More

BRIGHTON (WWJ) – Burtek Enterprises Inc. of Chesterfield Township in Macomb County has been selected as the manufacturing and assembly partner of the WIND-e20 wind turbine designed by Brighton-based Clean Green Energy Inc.

Under the deal between the two companies, Burtek will fabricate and assemble the WIND-e20, manage the manufacturing value stream and work with CGE to improve CGE’s design for cost-effective manufacturability.

Burtek is a full-service design, engineering, and manufacturing organization. A military contractor, Burtek has 25 years of experience in designing, producing, testing and integrating complex systems and applications for military vehicles, radar platforms and other defense products.

“Burtek has taken a radar system from concept design to final combat zone delivery in a six month timeframe,” said Bryan Zaplitny, President of CGE. “That solidified them as the perfect manufacturing partner for WIND-e20.”

Burtek designs and builds its products in a 230,000-square-foot flexible manufacturing plant.

A video about the relationship is available at http://www.youtube.com/watch?v=LI9eMdie-Uk.

More information about CGE can be found at http://www.cleangreenenergyllc.com

View Comments
blog comments powered by Disqus