Clean Green Energy, Chesterfield Twp. Firm Partner For Wind Turbines

BRIGHTON (WWJ) — Burtek Enterprises Inc. of Chesterfield Township in Macomb County has been selected as the manufacturing and assembly partner of the WIND-e20 wind turbine designed by Brighton-based Clean Green Energy Inc.

Under the deal between the two companies, Burtek will fabricate and assemble the WIND-e20, manage the manufacturing value stream and work with CGE to improve CGE’s design for cost-effective manufacturability.

Burtek is a full-service design, engineering, and manufacturing organization. A military contractor, Burtek has 25 years of experience in designing, producing, testing and integrating complex systems and applications for military vehicles, radar platforms and other defense products.

“Burtek has taken a radar system from concept design to final combat zone delivery in a six month timeframe,” said Bryan Zaplitny, President of CGE. “That solidified them as the perfect manufacturing partner for WIND-e20.”

Burtek designs and builds its products in a 230,000-square-foot flexible manufacturing plant.

A video about the relationship is available at http://www.youtube.com/watch?v=LI9eMdie-Uk.

More information about CGE can be found at http://www.cleangreenenergyllc.com

Comments

Leave a Reply

Fill in your details below or click an icon to log in:

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

More From CBS Detroit

Best 4th Of July Concerts In Metro DetroitStaying home this weekend? Celebrate the 4th of July by rocking out at one of these shows.
Hump Day Drinks: 8 Cheery Cocktail RecipesNow that you've made it through half the work week, it's time to celebrate!

Watch & Listen