CBS62logoNEW2013_blue_final_header_White wwj950-sm2011b 971-ticket-35smb 35h_CBSSportsRad_Detroit

Clean Green Energy, Chesterfield Twp. Firm Partner For Wind Turbines

View Comments
Clean Green Energy
mattroush Matt Roush
Matt Roush joined WWJ Newsradio 950 in September 2001 to spearhead the...
Read More

BRIGHTON (WWJ) – Burtek Enterprises Inc. of Chesterfield Township in Macomb County has been selected as the manufacturing and assembly partner of the WIND-e20 wind turbine designed by Brighton-based Clean Green Energy Inc.

Under the deal between the two companies, Burtek will fabricate and assemble the WIND-e20, manage the manufacturing value stream and work with CGE to improve CGE’s design for cost-effective manufacturability.

Burtek is a full-service design, engineering, and manufacturing organization. A military contractor, Burtek has 25 years of experience in designing, producing, testing and integrating complex systems and applications for military vehicles, radar platforms and other defense products.

“Burtek has taken a radar system from concept design to final combat zone delivery in a six month timeframe,” said Bryan Zaplitny, President of CGE. “That solidified them as the perfect manufacturing partner for WIND-e20.”

Burtek designs and builds its products in a 230,000-square-foot flexible manufacturing plant.

A video about the relationship is available at http://www.youtube.com/watch?v=LI9eMdie-Uk.

More information about CGE can be found at http://www.cleangreenenergyllc.com

View Comments
blog comments powered by Disqus