Watch CBS News

Clean Green Energy, Chesterfield Twp. Firm Partner For Wind Turbines

BRIGHTON (WWJ) -- Burtek Enterprises Inc. of Chesterfield Township in Macomb County has been selected as the manufacturing and assembly partner of the WIND-e20 wind turbine designed by Brighton-based Clean Green Energy Inc.

Under the deal between the two companies, Burtek will fabricate and assemble the WIND-e20, manage the manufacturing value stream and work with CGE to improve CGE's design for cost-effective manufacturability.

Burtek is a full-service design, engineering, and manufacturing organization. A military contractor, Burtek has 25 years of experience in designing, producing, testing and integrating complex systems and applications for military vehicles, radar platforms and other defense products.

"Burtek has taken a radar system from concept design to final combat zone delivery in a six month timeframe," said Bryan Zaplitny, President of CGE. "That solidified them as the perfect manufacturing partner for WIND-e20."

Burtek designs and builds its products in a 230,000-square-foot flexible manufacturing plant.

A video about the relationship is available at www.youtube.com/watch?v=LI9eMdie-Uk.

More information about CGE can be found at www.cleangreenenergyllc.com

View CBS News In
CBS News App Open
Chrome Safari Continue
Be the first to know
Get browser notifications for breaking news, live events, and exclusive reporting.