GAY, Mich. (AP) – A dredging project in Grand Traverse Bay Harbor in Michigan’s Upper Peninsula has been delayed due to permit and contracting issues.

The Michigan Department of Natural Resources says dredging expected to start this spring will be postponed until at least fall. It’s part of efforts to save Buffalo Reef off Gay, northwest of Marquette.

The U.S. Environmental Protection Agency provided $3 million to the U.S. Army Corps of Engineers for the project. But permits and paperwork are being reworked over concerns including dredging natural sands versus so-called stamp sands from an underwater trough.

Stamp sands created in the early 1900s as a byproduct of copper processing at two mills threaten to cover the natural fish-spawning reef and beaches. The coarse black sands have drifted after being dumped into Lake Superior.

© 2018 Associated Press. All Rights Reserved. This material may not be published, broadcast, rewritten, or redistributed.

Comments

Leave a Reply

Please log in using one of these methods to post your comment:

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s