Watch CBS News

MDOT Update: Traffic Shift Planned On Southbound Gratiot Avenue Between 11 Mile, 13 Mile Road In Roseville

(CBS DETROIT) - The Michigan Department of Transportation (MDOT) announced there will be a traffic shift as the Rebuilding M-3 Project continues.

The next stage is to shift traffic from the outside right lanes into the inside left lanes.

Weather permitting, traffic will be reduced to one lane on southbound M-3 (Gratiot Avenue) between 13 Mile and 11 Mile roads in order to paint new lane markings, move barrels, etc., to shift traffic safely.

Southbound M-3 will be reduced to one lane from 13 Mile Road to 11 Mile Road on Wednesday, June 9, between 7 a.m. and 5 p.m. If delayed by weather, the traffic shift will occur on Thursday, June 10.

Northbound M-3's traffic shift has already been completed.

Access will be available to all businesses. Those businesses with multiple driveways will always have one driveway open. Those businesses with only one driveway will have theirs rebuilt part-width, with half the driveway open while the other half is being repaired.

Detour signs designating crossover locations for truck traffic are posted due to reduced turning areas.


© 2021 CBS Broadcasting Inc. All Rights Reserved. This material may not be published, broadcast, rewritten, or redistributed.

View CBS News In
CBS News App Open
Chrome Safari Continue
Be the first to know
Get browser notifications for breaking news, live events, and exclusive reporting.